gemeinwert
BIM CVP

gemeinwert  /  wiki  /  standards  /  buildingSMART Switzerland

buildingSMART Switzerland

The Swiss implementation reference as an optional regional profile: Bauen digital Schweiz / buildingSMART Switzerland, KBOB, BIM-Abwicklungsmodell, national terminology and BIM2FM handover logic.

Regional profile

Switzerland is useful as a regional adapter because the Swiss references combine ISO 19650 terminology, national glossary work, public procurement guidance and operation-oriented BIM2FM practice.

Why Switzerland is useful

Switzerland is useful as a regional profile because it is multilingual, procurement-aware and lifecycle-oriented. It also sits between German, French and Italian terminology, which makes it a good example for local terminology and procurement adapters.

NeedSwiss referenceHow we use it
Common terminologyNational Glossary by BdCH/bSCH, CRB, SBB, SIA.Language tags and glossary pages.
Process modelBIM-Abwicklungsmodell.Workflow model and role/state naming.
Public clientsKBOB recommendations on BIM.Procurement and data-sovereignty arguments.
Operation handoverBIM2FM, AIM, data field catalogue.Lifecycle event families beyond BCF.
International fitSN EN ISO 19650, EN 17412, buildingSMART standards.Compatibility with broader openBIM tooling.

Reference stack

The Swiss stack is not a replacement for buildingSMART International. It is the national process layer on top of the international standards.

buildingSMART International
  -> IFC, BCF, IDS, bSDD, openCDE

ISO / EN / SN EN
  -> ISO 19650, EN 17412, EN ISO 29481

Bauen digital Schweiz / buildingSMART Switzerland
  -> BIM-Abwicklungsmodell, National Glossary, Stufenplan, Expert Groups

KBOB
  -> public-client BIM recommendations

Gemeinwert / BIM-CVP
  -> signed event workflow and interoperable clients

BIM-Abwicklungsmodell

The BIM-Abwicklungsmodell explains information management in digital planning, construction and operation across the life cycle. For this wiki, its most useful contribution is structure: it separates organisation, project and asset/operator layers and links information requirements to use cases, information delivery and CDE workflow.

ConceptWorkflow meaningEvent implication
Organisation needsStrategic information requirements above one project.30880 reusable requirement sets.
Project deliveryPIM and project-specific delivery rules.30902, 30904, 30970.
Asset operationAIM handover and operation information.Lifecycle and maintenance event families.
Use cases / IDMDefine why information is exchanged.Project use-case tags and IDS references.
CDE workflowStateful information containers.ISO state tags and approval events.

KBOB and public clients

KBOB is important because it frames BIM for public and institutional clients. For BIM-CVP, KBOB-style requirements translate into explicit contract annexes: open standards, structured data delivery, data ownership, security, liability and clear handover rules.

Procurement rule for this project: a CDE requirement should never say only "use platform X". It should require exportable IFC, BCF, IDS/openCDE workflows, auditability, role model and data handover.

National Glossary

The National Glossary matters more than it looks. If German, French and Italian teams use different words for the same role or state, the software must not silently collapse them. BIM-CVP should store stable internal codes and render national labels per language.

Internal codeSwiss/ISO-facing labelWhy code wins
appointing-partyClient / AuftraggeberseiteSame role can render differently by country.
lead-appointedLead appointed partyISO-compatible for international projects.
info-managerInformation manager / BIM manager contextCountry-specific title, stable permission group.
SharedShared / geteilt / condivisoState machine must not depend on UI language.

BIM2FM and AIM

BIM2FM is where the workflow stops being only planning coordination. The owner needs an Asset Information Model, data fields for operation, and a way to connect project information to facility management. In the event model this means BCF is only the first workflow; maintenance, product data, site diary, LCA and approvals are the next layers.

PIM during design/construction
  -> IFC file references
  -> BCF topics
  -> IDS validation
  -> approval

handover
  -> AIM package
  -> operation data field catalogue
  -> maintenance cycles
  -> product data and evidence links

Event mapping

Swiss process objectEvent mappingNotes
BIM-Abwicklungsmodell profile30902 project extensionsValue lists, roles, stage naming, language policy.
KBOB public-client requirements30880, 30970Requirement sets and formal approvals.
National glossary termlang tags, content label mapsStable internal code, multilingual rendering.
BIM2FM data field30881, 30962, product data eventsHandover and operation data.
CDE stateiso19650-state, 30970State transition requires signed approval.

Read on